A research system with a lead agent and four parallel subagents gives good results, but its token spend is too high. Which model assignment is the recommended cost lever?
Choose an answer to check it. Afterward, select any option to review its explanation.
This is the most expensive configuration; reserving the capable model for the steps that need it is the point of model selection as a lever.
Each subagent spends its own tokens, so the multiplied cost sits mostly in the workers; keeping the stronger model on the lead, which plans and synthesizes, while the workers run cheaper models cuts spend where it multiplies.
Smaller models are a valid lever where possible, which makes this tempting, but downgrading the lead too gives up the capable model on the planning and synthesis step that needs it.
This inverts the guidance: it puts the expensive model where the cost is multiplied by the number of workers and weakens the step that plans and synthesizes.
id q09e50af08e